Wapda

SNO NAME DESCRIPTION LOCATION YEAR
01

WAPDA Lakhra near Hyderabad

Designing & Construction of 3 Km of 10” diameter steel pipelines with Water Pumping Station including eight sedimentation tanks of capacity 100,000 gallons each for 150 MW F.B.C. coal power station. Lakhra
02

WAPDA Khanote near Hyderabad

Designing & Laying of 4.5 Km of 8” dia steel pipeline from sedimentation tanks to residential colony WAPDA’s coal power station. Khanote
03

WAPDA through Dong Fong Electric Corporation of China.
Lakhra Power Station.

Construction of underground 1230 meters of 1420 mm X 10 mm and 90 meter of 1020 mm X 10 mm pipelines with various fittings for circulating water system at 150 MW (3 X 50 MW). Lakhra
04

WAPDA Nawabshah

Thrust Boring of twin 24” diameter pipeline crossing under Railway Track for water flow. Nawabshah
05

WAPDA through Dong Fong Electric Corporation of China.
Lakhra Coal Power Station.

Fabrication of Hot and Cold Air Ducts for boiler at Lakhra Power Station. Lakhra
06

WAPDA through Dong Fong Electric Corporation of China.
Lakhra Coal Power Station.

Fabrication and erection of the following tanks:

1. 300m3 demineration water tanking weight 14.6 tons each – 2 set.
2. 150m3 soften water tanks, weight 4.786 ton – 1 set.
3. 30m3 Drain Water Tank, weight 2.962 ton each – 2 sets.
4. 20m3 Oil Tank, weight 2.405 tons – 2 sets.
5. 2m3 Makeup Oil Tanks, weight 0.68 ton – 1 set
Khanote
07

WAPDA through Dong Fong Electric Corporation of China.
Lakhra Coal Power Station.

Painting of Equipment and piping 16522m2. Khanote
08

WAPDA through HUBAI Electric Power Corporation (HEPEC) China.
Kotri near Hyderabad

Fabrication and Installations works for 50 MW combined cycle power plant at Kotri were carried out as mentioned below.

  1. Installation and Fabrication of inlet and out ducts and chimneys for boilers.
  2. Installation of piping system (Carbon Steel and Stainless) for condensate water of sizes from 25 mm to 325 mm.
  3. Installation and Fabrication of complete high pressure steam boiler carbon and alloy, steel piping having sizes from 79 mm to 610 mm with thickness varying from 6 mm to 20 mm. The system was welded with combination of GTAW and SAW with 100% X-Ray inspection.
  4. Installation of complete firm fighting system with piping.
  5. All piping system in other areas like, turbine house, pump houses etc.
  6. Circulating water pipings system.
Kotri
09

WAPDA through Dong Fong Electric Corporation of China.
Larkhra 50 Km from Hyderabad.

FConstruction (Civil Construction) of the followings in 150 MW (3 X 50 MW) (FBC) coal fired thermal power station at Khanot near Hyderabad.

  1. Chemical water treatment plant building.
  2. Acid and base storage.
  3. Neutralizing pool.
  4. Coal handling switch rooms building.
  5. Machine shop.
  6. Garage and fire station.
  7. Soft water treatment building.
  8. Industrial water pump house.
  9. Glass fibber cooling tower.
  10. Demineralized water tank.
  11. Refrigeration and air conditioning plants building.
Larkhra
10

WAPDA Guddu

Designed and Installed the Cathodic Protection System for 50 Km of 16” diameter pipeline Khandkhot to Guddu thermal power station natural gas pipeline. Guddu