SNO | NAME | DESCRIPTION | LOCATION | YEAR |
---|---|---|---|---|
01 |
STFA Construction Company |
Cleaning, preparing and painting of weld seam and interior of 3000 / 3300 mm dia steel conduit / siphon at Pehur High Level Canal Project at Turbela constructed by STFA / Ciltug of Turkey. Total area painted: 88582 sq ft. | – | – |
02 |
STFA, Tarbela |
Ultrasonic Testing of Welding joints of pipes of 3150, 3250 and 3350 mm OD and 6.5 Km long pipeline 900 joints having scanning length of 9400 meter. | July 2000 to November 2002 |