Shell

SNO NAME DESCRIPTION LOCATION YEAR
01

Shell Pakistan Limited

Inspection and Maintenance Contract of CP System at Chaklala, Kemari, Machike and Shikarpur 2010 (In Progress)
02

Shell Pakistan Limited

CP System for relocated CKL-ISB Pipeline 2008
03

Shell Pakistan Limited

Inspection and Maintenance Contract of existing CP System at Shikarpur, Machike, Kemari and Chaklala 2007-2008
04

Shell Pakistan Limited

Report on CP System Aviation Fueld on hydrant pipeline at Jinnah International Airport 2007
05

Shell Pakistan Limited

Contract for monitoring of the following Shell Oil Pipelines.

  1. Shell installation to PARCO Station Shikarpur.
  2. Shall installation to PARCO station at Mahmood Kot
  3. Attock Refinery to Shell installation Chaklala.
  4. Shell Chaklala installation to Air Port.
2004
06

Shell Pakistan Limited

Installation of Deepwell Groundbed on 7 KM 6” dia Shell Oil Pipeline from ARL Refinery to Chaklala Shell Terminal Rawalpindi. March 2002
07

Shell Pakistan Limited

Design, supply and installation of Deepwell Groundbed for 7 Km Shell 6” dia Pipeline from POL refinery to Chaklala Shell Terminal. 2001
08

Shell Pakistan Limited

Inspection of erection of SP-14 (Fuel Tank) at Keamari Installation. Nov-2000 to Jan-2001
09

Shell Pakistan Limited

Welding inspection of 8” dia pipe for fire fighting at Keamari Installation. July-99 to Sept-99
10

Shell Pakistan Limited

Inspection of installation of meters (Smith) at Daulatpur. Sept-99 to Dec-99
11

Shell Pakistan Limited

Inspection of laying of 6” dia pipeline from Shell Installation at Chaklala to Airport Islamabad. June-99 to Dec-99
12

Shell Pakistan Limited

Inspection of laying of 8” dia pipeline from PARCO to Shell Installations at Shikarpur. April-99 to June-99